- System view
- Tube + hose
Connections and routing are reviewed together.
S—04 / CONSTRUCTION MACHINERY
We review routed construction-machinery tube and hose components together with connection geometry, clearance, operating environment, joining and inspection requirements.
MM / S—04 Millimeters Matter® ROUTE • CONNECTION • DUTY Connections and routing are reviewed together.
The route follows the drawing and requirements.
Method and acceptance limits are agreed per product.
01 / INTERFACES
Tube diameter, wall thickness, bend sequence, fitting geometry, hose connection, clearance and assembly direction are reviewed as one system.
Hydraulic or coolant lines, tube-to-hose assemblies, guards and handrail geometry may require different forming and verification routes; the drawing and operating data determine which processes apply.
02 / OPERATING DATA
Provide fluid, pressure, temperature, environmental exposure, duty cycle, test requirements, drawing, quantities and target timing where relevant.
T—01 / TECHNICAL REVIEW
Share the drawing and application conditions so materials, processes and validation needs can be assessed together.